最終更新日:2025/12/22
例文
[T]he
Contract
with
the
Pipe-water
Pavior
was,
as
he
recollects,
to
keep
the
Pavement
in
Repair
for
ſix
Weeks;
did
oblige
the
Contractor
to
repair
many
Places
in
that
ſix
Weeks;
there
was
a
Part
of
the
new
Main
failed
in
Dame-ſtreet;
was
obliged
to
take
up
three
or
four
Pieces
in
Length,
in
conſequence
of
a
Sewer
being
made
there,
which
undermined
the
Main,
and
put
it
out
of
its
Place;
[…]
復習用の問題
[T]he Contract with the Pipe-water Pavior was, as he recollects, to keep the Pavement in Repair for ſix Weeks; did oblige the Contractor to repair many Places in that ſix Weeks; there was a Part of the new Main failed in Dame-ſtreet; was obliged to take up three or four Pieces in Length, in conſequence of a Sewer being made there, which undermined the Main, and put it out of its Place; […]
音声機能が動作しない場合はこちらをご確認ください
項目の編集設定
- 項目の編集権限を持つユーザー - すべてのユーザー
- 項目の新規作成を審査する
- 項目の編集を審査する
- 項目の削除を審査する
- 重複の恐れのある項目名の追加を審査する
- 項目名の変更を審査する
- 審査に対する投票権限を持つユーザー - 編集者
- 決定に必要な投票数 - 1
例文の編集設定
- 例文の編集権限を持つユーザー - すべてのユーザー
- 例文の削除を審査する
- 審査に対する投票権限を持つユーザー - 編集者
- 決定に必要な投票数 - 1
問題の編集設定
- 問題の編集権限を持つユーザー - すべてのユーザー
- 審査に対する投票権限を持つユーザー - 編集者
- 決定に必要な投票数 - 1
