positive drainage

名詞
不可算名詞

(construction) the drainage condition in which consideration has been made during design for all loading deflections of the deck and additional roof slope has been provided to ensure drainage within 48 hours following rainfall during conditions conducive to drying.

このボタンはなに?

復習用の問題

(construction) the drainage condition in which consideration has been made during design for all loading deflections of the deck and additional roof slope has been provided to ensure drainage within 48 hours following rainfall during conditions conducive to drying.

音声機能が動作しない場合はこちらをご確認ください
正解を見る

positive drainage

During the retrofit, engineers implemented positive drainage on the roof deck so that all loading deflections were accounted for and water would be removed within 48 hours after rainfall under conditions conducive to drying.

正解を見る

During the retrofit, engineers implemented positive drainage on the roof deck so that all loading deflections were accounted for and water would be removed within 48 hours after rainfall under conditions conducive to drying.

音声機能が動作しない場合はこちらをご確認ください

英語 - 多言語

項目の編集履歴(0)
項目の編集設定
  • 項目の編集権限を持つユーザー - すべてのユーザー
  • 項目の新規作成を審査する
  • 項目の編集を審査する
  • 項目の削除を審査する
  • 重複の恐れのある項目名の追加を審査する
  • 項目名の変更を審査する
  • 審査に対する投票権限を持つユーザー - 編集者
  • 決定に必要な投票数 - 1
例文の編集設定
  • 例文の編集権限を持つユーザー - すべてのユーザー
  • 例文の削除を審査する
  • 審査に対する投票権限を持つユーザー - 編集者
  • 決定に必要な投票数 - 1
問題の編集設定
  • 問題の編集権限を持つユーザー - すべてのユーザー
  • 審査に対する投票権限を持つユーザー - 編集者
  • 決定に必要な投票数 - 1
編集ガイドライン

ログイン / 新規登録

 

アプリをダウンロード!
DiQt

DiQt(ディクト)

無料

★★★★★★★★★★