最終更新日:2025/11/24
During the retrofit, engineers implemented positive drainage on the roof deck so that all loading deflections were accounted for and water would be removed within 48 hours after rainfall under conditions conducive to drying.
正解を見る
During the retrofit, engineers implemented positive drainage on the roof deck so that all loading deflections were accounted for and water would be removed within 48 hours after rainfall under conditions conducive to drying.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)
元となった例文
改修の際、エンジニアはデッキの荷重によるたわみを設計段階で考慮し、追加の屋根勾配を設けて乾燥しやすい条件下で降雨後48時間以内に確実に排水されるように排水設計を行いました。