最終更新日:2025/11/24
Before approving the grant, the panel insisted that the concept be made operationalisable through clear metrics and procedures.
正解を見る
Before approving the grant, the panel insisted that the concept be made operationalisable through clear metrics and procedures.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)