最終更新日:2025/12/06
During the safety test the reactor briefly became prompt critical, and the ensuing power rise happened on a millisecond timescale that operators could not control.
正解を見る
During the safety test the reactor briefly became prompt critical, and the ensuing power rise happened on a millisecond timescale that operators could not control.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)