最終更新日:2025/11/27
To enhance the seismic fitness of the new hospital, the design team prioritized vibration control throughout the structural plan.
正解を見る
To enhance the seismic fitness of the new hospital, the design team prioritized vibration control throughout the structural plan.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)