最終更新日:2025/11/24
Before laying the first course of shingles, the crew installed a starter strip along the downslope eave to fill the spaces between cut-outs and the joints of the first course.
正解を見る
Before laying the first course of shingles, the crew installed a starter strip along the downslope eave to fill the spaces between cut-outs and the joints of the first course.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)