最終更新日:2025/11/24
Before applying the new membrane, the inspector deployed a nuclear hydrogen detection meter to scan the roof for residual moisture.
正解を見る
Before applying the new membrane, the inspector deployed a nuclear hydrogen detection meter to scan the roof for residual moisture.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)