最終更新日:2025/11/23
The engineer ordered a sap fagot to be placed across the trench to close the crevices between the gabions before the parapet was made.
正解を見る
The engineer ordered a sap fagot to be placed across the trench to close the crevices between the gabions before the parapet was made.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)