Before shipment, each transformer undergoes a dielectric withstand test to ensure its insulation can tolerate operating voltages without excessive leakage current.
正解を見る
Before shipment, each transformer undergoes a dielectric withstand test to ensure its insulation can tolerate operating voltages without excessive leakage current.