最終更新日:2025/12/05
The engineer inspected the reversing shaft before starting the locomotive to ensure it would reverse the steam passage order through the engine's ports correctly.
正解を見る
The engineer inspected the reversing shaft before starting the locomotive to ensure it would reverse the steam passage order through the engine's ports correctly.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)