最終更新日:2025/11/30
The inspection showed that the drill double penetrates the pipe when operated at high speed, leading to structural damage.
正解を見る
The inspection showed that the drill double penetrates the pipe when operated at high speed, leading to structural damage.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)