最終更新日:2025/11/29
Before the concrete pour, the site supervisor reviewed the rodding to confirm the steel placement met the engineering drawings.
正解を見る
Before the concrete pour, the site supervisor reviewed the rodding to confirm the steel placement met the engineering drawings.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)