最終更新日:2025/11/24
The contractor specified a minimum drying time of 48 hours to ensure the coating would resist dew, rain, and freezing temperatures.
正解を見る
The contractor specified a minimum drying time of 48 hours to ensure the coating would resist dew, rain, and freezing temperatures.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)