最終更新日:2025/11/21
Before the long uphill run, the locomotive's engineer inspected the trailing axle to make sure the unpowered wheels were secure.
正解を見る
Before the long uphill run, the locomotive's engineer inspected the trailing axle to make sure the unpowered wheels were secure.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)