最終更新日:2025/11/21
Before convoys crossed the valley, engineers inspected each bridge's military load classification to ensure it could support the heavy transport trucks.
正解を見る
Before convoys crossed the valley, engineers inspected each bridge's military load classification to ensure it could support the heavy transport trucks.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)