最終更新日:2025/11/29
The contractors scheduled two screedings to ensure the floor's surface was perfectly level before installing the hardwood.
正解を見る
The contractors scheduled two screedings to ensure the floor's surface was perfectly level before installing the hardwood.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)