最終更新日:2025/11/22
Waterfalling along the dam crest led to widespread spalling of the concrete, forcing engineers to close the structure for repairs.
正解を見る
Waterfalling along the dam crest led to widespread spalling of the concrete, forcing engineers to close the structure for repairs.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)