最終更新日:2025/11/21
The construction team installed a diaphragm wall around the site to prevent groundwater inflow and secure the deep excavation.
正解を見る
The construction team installed a diaphragm wall around the site to prevent groundwater inflow and secure the deep excavation.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)