最終更新日:2022/12/24
Full information was passed to the Glasgow North District Deputy Chief Controller at 4.45 a.m. on the Sunday of all engine movements required with the tonnage of coal needed for re-establishment of the coaling points at Bridgeton Central, Helensburgh and Clydebank Dock Junction, which would take the place of Hyndland.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)
元となった例文
Full
information
was
passed
to
the
Glasgow
North
District
Deputy
Chief
Controller
at
4.45
a.m.
on
the
Sunday
of
all
engine
movements
required
with
the
tonnage
of
coal
needed
for
re-establishment
of
the
coaling
points
at
Bridgeton
Central,
Helensburgh
and
Clydebank
Dock
Junction,
which
would
take
the
place
of
Hyndland.