最終更新日:2025/12/07
The engineering team reviewed the mass haul diagrams to determine how much soil needed to be moved between cut and fill locations.
正解を見る
The engineering team reviewed the mass haul diagrams to determine how much soil needed to be moved between cut and fill locations.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)