最終更新日:2025/12/02
The construction crew installed calcium silicate panels along the bridge to provide fire-resistant insulation and prevent moisture damage.
正解を見る
The construction crew installed calcium silicate panels along the bridge to provide fire-resistant insulation and prevent moisture damage.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)