最終更新日:2025/11/29
Before approving the plans, the engineer inspected the through bridge to confirm that the deck was carried by the lower truss chords and that traffic would travel between the trusses rather than over them.
正解を見る
Before approving the plans, the engineer inspected the through bridge to confirm that the deck was carried by the lower truss chords and that traffic would travel between the trusses rather than over them.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)