最終更新日:2025/11/25
After the blowout, the engineering team decided to perform a bottom kill to stop the uncontrolled flow and permanently seal the reservoir.
正解を見る
After the blowout, the engineering team decided to perform a bottom kill to stop the uncontrolled flow and permanently seal the reservoir.
音声機能が動作しない場合はこちらをご確認ください
編集履歴(0)