Last Updated:2022/12/24
During the two Sundays preceding the accident, the track had been lifted to permit installation of shallow raft abutments some five to six feet under the track, which will eventually support a temporary bridge span during the construction of the permanent span, and sheet piling across the formation to hold the sides of future excavation.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence
During
the
two
Sundays
preceding
the
accident,
the
track
had
been
lifted
to
permit
installation
of
shallow
raft
abutments
some
five
to
six
feet
under
the
track,
which
will
eventually
support
a
temporary
bridge
span
during
the
construction
of
the
permanent
span,
and
sheet
piling
across
the
formation
to
hold
the
sides
of
future
excavation.