Last Updated:2022/12/24

The estimated 2.7 million cubic metres of chalk and flint excavated from each tunnel (and then mixed with water to create slurry) will be treated and then reused to landscape the site and create a 127-hectare chalk grassland habitat.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★