Last Updated:2025/12/07
Before shipment, the manufacturer performed several dielectric withstand tests on each transformer to ensure insulation integrity.
See correct answer
Before shipment, the manufacturer performed several dielectric withstand tests on each transformer to ensure insulation integrity.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence
出荷前に、メーカーは各変圧器の絶縁の健全性を確保するために複数の耐電圧試験を実施しました。