Last Updated:2025/12/07
The formworker carefully measured the plywood panels before assembling the form to pour concrete.
See correct answer
The formworker carefully measured the plywood panels before assembling the form to pour concrete.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)