Last Updated:2025/12/07

The engineering team reviewed the mass haul diagrams to determine how much soil needed to be moved between cut and fill locations.

See correct answer

The engineering team reviewed the mass haul diagrams to determine how much soil needed to be moved between cut and fill locations.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

設計チームは、土量移動図を確認して、切土と盛土の間でどれだけの土を移動する必要があるかを判断した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★