Last Updated:2025/12/06
The contractors positioned an acrow prop beneath the beam to hold it while the brickwork was repaired.
See correct answer
The contractors positioned an acrow prop beneath the beam to hold it while the brickwork was repaired.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)