Last Updated:2025/12/06
The crew loaded the bridge sections onto a bogie bolster wagon for transport to the construction site.
See correct answer
The crew loaded the bridge sections onto a bogie bolster wagon for transport to the construction site.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)