Last Updated:2025/12/05
After the storm, the engineers inspected the bowstring bridge to ensure the arch and deck connections remained secure.
See correct answer
After the storm, the engineers inspected the bowstring bridge to ensure the arch and deck connections remained secure.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)