Last Updated:2025/12/05
The technicians installed the flapper boards on the dam to control water flow during the storm.
See correct answer
The technicians installed the flapper boards on the dam to control water flow during the storm.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)