Last Updated:2025/12/05
The engineer specified pretensioning for the bridge cables to prevent excessive deflection during high winds.
See correct answer
The engineer specified pretensioning for the bridge cables to prevent excessive deflection during high winds.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)