Last Updated:2025/12/04
The engineers fitted obdurators to each pipe joint to prevent leaks during the pressure test.
See correct answer
The engineers fitted obdurators to each pipe joint to prevent leaks during the pressure test.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)