Last Updated:2025/12/03
The field engineer adjusted the wellhead pressure to prevent a blowout during the storm.
See correct answer
The field engineer adjusted the wellhead pressure to prevent a blowout during the storm.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)