Last Updated:2025/12/02
The engineer inspected the shear steels for signs of fatigue before approving the design.
See correct answer
The engineer inspected the shear steels for signs of fatigue before approving the design.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)