Last Updated:2025/12/02
The survey crew carefully extended the leveling staffs across the uneven terrain to measure the elevation differences.
See correct answer
The survey crew carefully extended the leveling staffs across the uneven terrain to measure the elevation differences.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)