Last Updated:2025/12/02
The contractors inspected the hold-downs before pouring the concrete to ensure the structure would withstand high winds.
See correct answer
The contractors inspected the hold-downs before pouring the concrete to ensure the structure would withstand high winds.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)