Last Updated:2025/12/02
The engineers adjusted the viscosity of the drilling fluid to prevent the well from collapsing.
See correct answer
The engineers adjusted the viscosity of the drilling fluid to prevent the well from collapsing.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)