Last Updated:2025/12/02
The engineering team documented several sub-excavations near the foundation to assess soil stability.
See correct answer
The engineering team documented several sub-excavations near the foundation to assess soil stability.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence
技術チームは、基礎付近の複数の二次掘削を記録して土壌の安定性を評価した。