Last Updated:2025/12/02

The engineer inspected the primary structures for signs of fatigue after the storm.

See correct answer

The engineer inspected the primary structures for signs of fatigue after the storm.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

技術者は嵐の後、疲労の兆候がないか主要な構造部材を点検した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★