Last Updated:2025/12/01
Before the inspection, the crew installed extra check hooks along the rig to secure loose panels.
See correct answer
Before the inspection, the crew installed extra check hooks along the rig to secure loose panels.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)