Last Updated:2025/11/30

The engineer inspected the throatplate for cracks before the locomotive began its long uphill run.

See correct answer

The engineer inspected the throatplate for cracks before the locomotive began its long uphill run.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

機関士は長い上り坂を走る前に、機関車の火室前板に亀裂がないか点検した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★