Last Updated:2025/11/30
The engineer noticed a corroded drowned tube during the inspection and scheduled an immediate replacement to prevent boiler failure.
See correct answer
The engineer noticed a corroded drowned tube during the inspection and scheduled an immediate replacement to prevent boiler failure.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)