Last Updated:2025/11/29
The engineer slowed the train when the block signal turned red, ensuring the platform crew had time to clear the track.
See correct answer
The engineer slowed the train when the block signal turned red, ensuring the platform crew had time to clear the track.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)