Last Updated:2025/11/29
The engineers installed a Pelton wheel on the mountain stream to maximize hydroelectric output.
See correct answer
The engineers installed a Pelton wheel on the mountain stream to maximize hydroelectric output.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)