Last Updated:2025/11/29
The surveyor carefully set up the Troughton level on its tripod before beginning the site measurements.
See correct answer
The surveyor carefully set up the Troughton level on its tripod before beginning the site measurements.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)