Last Updated:2025/11/29

Before commissioning the equipment, the engineer calibrated the pilot valves to ensure accurate pressure control.

See correct answer

Before commissioning the equipment, the engineer calibrated the pilot valves to ensure accurate pressure control.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

装置の運転開始前に、技術者は正確な圧力制御を確保するためにパイロット弁を調整した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★