Last Updated:2025/11/29
Before the concrete pour, the site supervisor reviewed the rodding to confirm the steel placement met the engineering drawings.
See correct answer
Before the concrete pour, the site supervisor reviewed the rodding to confirm the steel placement met the engineering drawings.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)